Use the product and container specification to assess candidate fillers. Ask for the installed valve configuration, cleaning information and evidence from relevant production runs.
- What valve and filling configuration is installed?
- What product-contact and cleaning information can be reviewed?
Compare filling principles with the liquid specification
Describe the liquid and container before evaluating the fitted filling system. Ask for valve configuration, product-contact information and demonstrated applications. A filler suited to one liquid or package may require a different technical project for another.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.